Monday, April 30, 2018

Done and getting closer to done

First off, this afternoon  ( after dr. appt, stop at p.o. and walmart) I went back to working on the bovine quilt that's still on Mo'e.  Didn't get quite a complete row done, but pretty close... the blocks are done and the sashing between the blocks is done... I just need to do the sashing on top and bottom and then stitch on the borders.  It was a very slow day... very little chocolate and I was really in need of a nap that didn't happen.
 After dinner, I was determined to finish the Chubby Chicks quilt top... and I did - and without having to rip out any long seams - just a couple threads in a couple of places so that I could flip the seam to the other side... oh, and I had to rip out one seam at the very beginning... when I was piecing strips together for the outer borders.. turned out that one strip was 3 1/2" and the other one was 3 7/8". 

Now that it's done and I've taken a pic... even if not a very good one, I can take it down and set to working on my BOMs and RSC for April and May - yeah, I'm that far behind.  I'll do it Wednesday while our car is in the shop.

That's it for tonight...
take care... ttyl

No comments:

Post a Comment

What to work on next

 I finished the two gift quilts - and both have been delivered to a parent of the little girl recipient. I have the requested photo from one...