Six of the seven I want are done and stuffed with their goodies and ready to mail out next week. The last one doesn't need to be done until Christmas Eve at the latest so I've got time.
Friday, December 10, 2021
Time for stockings
Six of the seven I want are done and stuffed with their goodies and ready to mail out next week. The last one doesn't need to be done until Christmas Eve at the latest so I've got time.
Wednesday, December 8, 2021
And another one
Monday, December 6, 2021
I Did It!
Thursday, December 2, 2021
Wednesday, December 1, 2021
Would you believe?!?!
Friday, November 19, 2021
I've been busy (still)...
And then I started another quilt... this one is for my youngest daughter's bf/fiancé/partner/other half (not sure what to call him). He's been after me to make him a Las Vegas Raiders quilt...EVERY chance he gets - online, in the background when I'm on the phone with her, etc. I keep telling him "We'll see".
I bought the themed fabric a few months ago, but hadn't decided on the pattern I was going to use so didn't buy other fabrics to go with it until last week when I had decided on the pattern (BQ6) and I found just the right 2nd fabric at our local quilt shop. I needed a third fabric, but it was going to be white and I already had that at home.
I started cutting the pieces for the top on, I think it was Sunday, and had two blocks sewn by late Monday - and that's when I realized that I needed to figure out a different layout for some of the blocks so that the big squares were all facing the same direction. Took a bit of time, but I figured it out.
Wednesday, I was able to sew all the blocks together into rows and yesterday, it became a quilt top.
There's not a lot of space for me to stand to get a good photo (old sewing/craft room that still needs to be de-cluttered) and the ground is wet so I'm not taking it outside for it's photo op.
I bought Raiders themed fleece for the backing and will use my usual Hobbs 80/20 batting. I had enough of the themed fabric left over to make the binding and a couple of mug rugs.
Now, I just need to finish the quilt that's been on Mo'e 'forever' (since June)
so that I can get this latest top quilted in time to send for Christmas. Although, now that I'm thinking about it a little more, maybe I should just send the mug rugs for Christmas and then send the quilt later. LOLMonday, November 8, 2021
I've been busy
On to the next project
I started this one the day before yesterday and its going quicker than I thought it would. Too late for the 4th of July but we still have fi...
-
Monday - I worked a little slower due to overdoing it on Sunday but I did make the final 10 16 patch blocks for the Goodnight Irene quilt t...
-
Well, Moe is anyway - I don't run anymore lol. Apparently, he fixed himself. Tested him yesterday and he ran, but the stitches were sl...
-
I got the borders onto this quilt and made the label & cut the binding strips....that is basically all I've done quilting wise. H...