I was back working at the baby bowtie quilt. The top is done YAY!! and, after piecing just about everything that was left to add to the backing fabric, it's all loaded onto Mo'e - thread is wound on bobbins and threaded onto the machine; just not much energy left to actually do the quilting.
Here's the top hanging on my 'design wall'
Yes, I know that one pair of rows was attached upside down... it is what it is - I wasn't going to stress myself out making sure that everything was 'perfect'. I'm sure that whoever receives this probably won't even notice; they'll be too busy enjoying the colors and snuggling under it.
What's next? I think it's probably time I got back to the All stars blocks... maybe tomorrow. :)
TTYL
Monday, February 15, 2016
Subscribe to:
Post Comments (Atom)
What to work on next
I finished the two gift quilts - and both have been delivered to a parent of the little girl recipient. I have the requested photo from one...
-
I got the borders onto this quilt and made the label & cut the binding strips....that is basically all I've done quilting wise. H...
-
Monday - I worked a little slower due to overdoing it on Sunday but I did make the final 10 16 patch blocks for the Goodnight Irene quilt t...
-
Well, Moe is anyway - I don't run anymore lol. Apparently, he fixed himself. Tested him yesterday and he ran, but the stitches were sl...
No comments:
Post a Comment