...slow but steady... the current block in progress is almost half done...
It's not a very good pic, but I was sitting down and didn't want to get up... I still have some tree folage to do towards the middle and then I can move on to the other half of the block. That diagonal line running from lower right to upper left with a wavy line at the end is basting stitches that I'm cutting as they get in the way of my stitching. You'll see some in the upper left corner, too... I clipped in between the two lines so that I could work on the tree and some of the foliage behind the barbecue building.
That's it, though... no other 'quilting' today. Maybe I'll go clean up and run Mo'e tomorrow... or maybe not :).
TTYL
Monday, June 12, 2017
Subscribe to:
Post Comments (Atom)
What to work on next
I finished the two gift quilts - and both have been delivered to a parent of the little girl recipient. I have the requested photo from one...
-
I got the borders onto this quilt and made the label & cut the binding strips....that is basically all I've done quilting wise. H...
-
Monday - I worked a little slower due to overdoing it on Sunday but I did make the final 10 16 patch blocks for the Goodnight Irene quilt t...
-
Well, Moe is anyway - I don't run anymore lol. Apparently, he fixed himself. Tested him yesterday and he ran, but the stitches were sl...

No comments:
Post a Comment